| Naslov: | Mixed-integer nonlinear programming based optimal time scheduling of construction projects under nonconvex costs |
|---|
| Avtorji: | ID Cajzek, Rok (Avtor) ID Klanšek, Uroš (Avtor) |
| Datoteke: | Tehnicki_vjesnik_2016_Cajzek,_Klansek_Mixed-integer_nonlinear_programming_based_optimal_time_scheduling_of_construction_projects_under_n.pdf (807,33 KB) MD5: 1178B14F8570D6903AD13F3C93FBCFB7 PID: 20.500.12556/dkum/41ed34b3-6827-48a2-8b97-a5d490220bff
http://hrcak.srce.hr/153150
|
|---|
| Jezik: | Angleški jezik |
|---|
| Vrsta gradiva: | Znanstveno delo |
|---|
| Tipologija: | 1.01 - Izvirni znanstveni članek |
|---|
| Organizacija: | FGPA - Fakulteta za gradbeništvo, prometno inženirstvo in arhitekturo
|
|---|
| Opis: | Optimal project scheduling under nonconvex time-cost relations represents a challenging problem in construction management. The nonconvex time-cost relations may appear in a construction project when several different duration options are available for its activities due to alternative technological processes enabled for their realization or wide accessibility of production resources. The source of nonconvexity of the project scheduling optimization problem can also be the project penalty- or bonus-duration relations arranged within the construction contract. The aim of this paper is to present the mixed-integer nonlinear programming (MINLP) based optimal time scheduling of construction projects under nonconvex costs. For this purpose, the MINLP model was developed and applied. A numerical example from literature and an example of construction project time-cost trade-off analysis under practical nonconvex penalty function are given in the paper to demonstrate advantages of MINLP optimization. The example from literature first presented the capability of the MINLP approach to obtain the optimal solution for difficult, highly combinatorial nonconvex discrete project scheduling problem. Thereupon, the following example revealed that the optimal project time-cost curve may take very nonuniform shape on account of discrete nature of activity direct cost options and nonconvex relation between project duration and total cost. In this way, the presented study intends to provide practitioners with new information from the field of optimization techniques for project scheduling as well as an alternative view on performance of total cost when project duration is changed. |
|---|
| Ključne besede: | extreme environments, construction management, discrete optimization, mixed-integer nonlinear programming, nonconvex costs, time scheduling |
|---|
| Status publikacije: | Objavljeno |
|---|
| Verzija publikacije: | Objavljena publikacija |
|---|
| Leto izida: | 2016 |
|---|
| Št. strani: | str. 9-18 |
|---|
| Številčenje: | Letn. 23, št. 1 |
|---|
| PID: | 20.500.12556/DKUM-66820  |
|---|
| ISSN: | 1330-3651 |
|---|
| UDK: | 624.07:519.853 |
|---|
| COBISS.SI-ID: | 19354390  |
|---|
| DOI: | 10.17559/TV-20140108112928  |
|---|
| ISSN pri članku: | 1330-3651 |
|---|
| NUK URN: | URN:SI:UM:DK:TQ8CMC1L |
|---|
| Datum objave v DKUM: | 12.07.2017 |
|---|
| Število ogledov: | 1770 |
|---|
| Število prenosov: | 453 |
|---|
| Metapodatki: |  |
|---|
| Področja: | Ostalo
|
|---|
|
:
|
Kopiraj citat |
|---|
| | | | Skupna ocena: | (0 glasov) |
|---|
| Vaša ocena: | Ocenjevanje je dovoljeno samo prijavljenim uporabnikom. |
|---|
| Objavi na: |  |
|---|
Postavite miškin kazalec na naslov za izpis povzetka. Klik na naslov izpiše
podrobnosti ali sproži prenos. |