| Naslov: | Reinforced piled embankment for a high-speed railway over soft soil : a numerical and analytical investigation |
|---|
| Avtorji: | ID Zhuang, Yan (Avtor) ID Cui, Xiaoyan (Avtor) ID Fakulteta za gradbeništvo, prometno inženirstvo in arhitekturo Univerze v Mariboru (Lastnik avtorskih pravic) |
| Datoteke: | Acta_geotechnica_Slovenica_2015_Zhuang,_Cui_Reinforced_piled_embankment_for_a_high-speed_railway_over_soft_soil_a_numerical_and_analyti.pdf (578,98 KB) MD5: 0CB82268705EA693BF2D06445F5AFD4A PID: 20.500.12556/dkum/d7d9c2d5-c2e4-4e04-8322-d7b8702efe9b
http://fgserver3.fg.um.si/journal-ags/2015-2/article-5.asp
|
|---|
| Jezik: | Angleški jezik |
|---|
| Vrsta gradiva: | Znanstveno delo |
|---|
| Tipologija: | 1.01 - Izvirni znanstveni članek |
|---|
| Organizacija: | FGPA - Fakulteta za gradbeništvo, prometno inženirstvo in arhitekturo
|
|---|
| Opis: | A geosynthetic, reinforced, piled embankment is an effective and economic method to solve the problems of possible bearing failure, unacceptable settlement and slope instability for an embankment built over soft soil; this has led to its widespread use, especially for high-speed railway embankments. Some design methods have been developed to assess the performance of these reinforced structures, which are mainly based on the results from small-scale models and numerical simulations. However, the reliability of these methods needs to be validated under full-scale field tests. This paper presents a numerical and analytical study for a full-scale field test of the Fengyang high-speed railway embankment. The results were analyzed and discussed in terms of the settlement of subsoil, the stressconcentration ratio (SCR), the axial force and the frictional stress of the pile. They showed that the settlement of the subsoil, from both the finite-element method (FEM) and the analytical method, were in good agreement with the measurement, and thus was a reliable parameter to assess the performance of the piled embankment with reasonable accuracy. The SCR was overestimated by the modified Terzaghi method, with a difference of 25%, while it was underestimated by the FEM, with a difference of approximately 20%. It was also shown that the tensile force in the reinforcement could be effectively assessed using the proposed analytical method, while it was overestimated by the FEM with a difference of 44%. |
|---|
| Ključne besede: | reinforced piled embankment, high-speed railway, numerical simulation, analytical method |
|---|
| Status publikacije: | Objavljeno |
|---|
| Verzija publikacije: | Objavljena publikacija |
|---|
| Leto izida: | 2015 |
|---|
| Št. strani: | str. 57-65 |
|---|
| Številčenje: | Letn. 12, št. 2 |
|---|
| PID: | 20.500.12556/DKUM-70853  |
|---|
| ISSN: | 1854-0171 |
|---|
| UDK: | 624.154 |
|---|
| COBISS.SI-ID: | 284302080  |
|---|
| ISSN pri članku: | 1854-0171 |
|---|
| NUK URN: | URN:SI:UM:DK:MMJSNCPM |
|---|
| Avtorske pravice: | Fakulteta za gradbeništvo, prometno inženirstvo in arhitekturo Univerze v Mariboru |
|---|
| Datum objave v DKUM: | 15.06.2018 |
|---|
| Število ogledov: | 1945 |
|---|
| Število prenosov: | 347 |
|---|
| Metapodatki: |  |
|---|
| Področja: | Ostalo
|
|---|
|
:
|
Kopiraj citat |
|---|
| | | | Skupna ocena: | (0 glasov) |
|---|
| Vaša ocena: | Ocenjevanje je dovoljeno samo prijavljenim uporabnikom. |
|---|
| Objavi na: |  |
|---|
Postavite miškin kazalec na naslov za izpis povzetka. Klik na naslov izpiše
podrobnosti ali sproži prenos. |