| | SLO | ENG | Cookies and privacy

Bigger font | Smaller font

Show document Help

Title:MONTAŽNI ARMIRANOBETONSKI LOČNI MOST ZA PEŠCE
Authors:ID Pintarič, Dominik (Author)
ID Dobrila, Peter (Mentor) More about this mentor... New window
ID Tajnik, Matjaž (Comentor)
Files:.pdf VS_Pintaric_Dominik_2009.pdf (6,99 MB)
MD5: 3E4D0AB6DDE2DD9886DA9D4BD9459283
PID: 20.500.12556/dkum/c98b9109-a4ff-48aa-bf3c-0b42f6c65333
 
Language:Slovenian
Work type:Undergraduate thesis
Organization:FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture
Abstract:V diplomskem delu je obravnavan montažni armiranobetonski ločni most za pešce, razpona 30 m. Ločno konstrukcijo je možno montirati z dvema avtodvigaloma. Konstrukcija je sestavljena iz dveh glavnih vzdolžnih tročlenskih ločnih nosilcev, ki sta na osnem razmaku 4,0 m, stebrov različnih višin in na osnem razmaku 5,0 m ter iz plošče z rebri. Plošča z rebri je monolitno betonirana. Ločna nosilca sta izven njune ravnine uklonsko zavarovana s prečnimi jeklenimi nosilci HEB in nateznimi diagonalami. Vsi sestavni deli mostu in stiki so dimenzionirani na podlagi evropskih predpisov za dimenzioniranje konstrukcij — Evrokodov oz. po slovenskih veljavnih predpisih SIST.
Keywords:most, betonske konstrukcije, jeklene konstrukcije, analiza konstrukcij, dimenzioniranje
Place of publishing:Maribor
Publisher:[D. Pintarič]
Year of publishing:2009
PID:20.500.12556/DKUM-11081 New window
UDC:624.2.014(043.2)
COBISS.SI-ID:13702678 New window
NUK URN:URN:SI:UM:DK:D1TBIJD4
Publication date in DKUM:15.12.2009
Views:4038
Downloads:373
Metadata:XML DC-XML DC-RDF
Categories:KTFMB - FG
:
Copy citation
  
Average score:(0 votes)
Your score:Voting is allowed only for logged in users.
Share:Bookmark and Share



Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.

Secondary language

Language:English
Title:PEDESTRIAN'S CONCRETE ARCH BRIDGE
Abstract:This thesis deals with a prefabricated concrete arch bridge for pedestrians, with a span of 30 m. The arch construction can be assembled by two truck cranes. The construction consist of two main longitudinal arch-girders with three joins, where the distance between axles of the girders is 4.0 m, pillars of different heights with a 5.0 m distance between the axles and of a ribbed plate. The ribbed plate is made of monolith concrete. Outside of their plane, the arch girders are laterally secured by HEB cross steel girders and tie elements. All components of the bridge and joins are dimensioned in accordance with European legislation and regulation for construction dimensioning – Eurocodes, respectively in accordance with Slovenian SIST rules in force.
Keywords:Bridge, concrete constructions, steel constructions, construction analysis, dimensioning


Comments

Leave comment

You must log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica