| | SLO | ENG | Cookies and privacy

Bigger font | Smaller font

Show document Help

Title:PRIMERJAVA OBRATOVALNIH KARAKTERISTIK HIDROELEKTRARN BOŠTANJ IN BLANCA
Authors:ID Ogorevc, Klemen (Author)
ID Štumberger, Gorazd (Mentor) More about this mentor... New window
Files:.pdf VS_Ogorevc_Klemen_2011.pdf (6,54 MB)
MD5: EAA1D7E19518AAC19398DEA8A9F04886
PID: 20.500.12556/dkum/8e81d3e7-526d-4ec1-9d46-d5ed1f7e1eff
 
Language:Slovenian
Work type:Undergraduate thesis
Organization:FERI - Faculty of Electrical Engineering and Computer Science
Abstract:V diplomskem delu je izvedena primerjava dveh hidroelektrarn, in sicer HE Boštanj ter HE Blanca. Primerjava je razdeljena na tri sklope. Prvi sklop primerjave temelji na primerjanju njunih jezovnih zgradb z nameščeno strojno in elektro opremo. V drugem sklopu je izvedena ekonomska analiza v programskem orodju RETScreen, katere rezultati prikazujejo finančne kazalce posamezne hidroelektrarne. V zaključnem sklopu primerjave pa je izvedena analiza obratovanja tipičnih dni posamezne hidroelektrarne z modelom v programskem orodju Matlab/Simulink, ki je izdelan na osnovi školjčnega diagrama turbine ter obratovalnega diagrama generatorja.
Keywords:hidroelektrarna, obnovljivi viri energije, obratovalni diagram, školjčni diagram, finančni kazalci
Place of publishing:Maribor
Publisher:[K. Ogorevc]
Year of publishing:2011
PID:20.500.12556/DKUM-18011 New window
UDC:621.311.21(043.2)
COBISS.SI-ID:15196950 New window
NUK URN:URN:SI:UM:DK:NKQT0HJL
Publication date in DKUM:12.04.2011
Views:2819
Downloads:396
Metadata:XML DC-XML DC-RDF
Categories:KTFMB - FERI
:
Copy citation
  
Average score:(0 votes)
Your score:Voting is allowed only for logged in users.
Share:Bookmark and Share



Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.

Secondary language

Language:English
Title:COMPARISON OF OPERATIONAL CHARACTERISTICS OF HYDRO POWER PLANTS BOŠTANJ AND BLANCA
Abstract:This diploma thesis presents a comparison between two hydroelectric power plants, HEPP Boštanj and HEPP Blanca. This comparison consists of three parts. The first part is based on the comparison of their dam structures with the mechanical and electric equipment installed. The second part contains an economic analysis performed with the RETScreen software. The results of this analysis show financial pointers of both hydroelectric plants. In the closing part of the comparison an analysis of the typical working days for each plant is preformed using model prepared in the program package Matlab/Simulink software. This model is based on a hill-chart diagram of the turbine and on an operating diagram of the sychrones generator.
Keywords:hydropower plant, renewable energy sources, operating diagram, hill-chart diagram, financial indicators


Comments

Leave comment

You must log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica