| | SLO | ENG | Cookies and privacy

Bigger font | Smaller font

Show document Help

Title:Načrtovanje proizvodnje po naročilu v podjetju Tehcenter Ptuj
Authors:ID Gmeiner, Tadej (Author)
ID Buchmeister, Borut (Mentor) More about this mentor... New window
ID Palčič, Iztok (Comentor)
Files:.pdf VS_Gmeiner_Tadej_2012.pdf (3,27 MB)
MD5: DD34C6A3C876912FC98F7BC8F0C3A3AF
PID: 20.500.12556/dkum/3b2634ae-9167-4f87-a8d3-0f9009b55313
 
Language:Slovenian
Work type:Undergraduate thesis
Typology:2.11 - Undergraduate Thesis
Organization:FS - Faculty of Mechanical Engineering
Abstract:Načrtovanje proizvodnje pomeni povezavo med konstrukcijo in proizvodnjo ter posledično tudi montažo, saj predpisuje, kako bo izdelek narejen. Hkrati odloča o učinkovitosti v proizvodnem obratu in proizvodnih stroških. V podjetju Tehcenter Ptuj je največ težav prav z učinkovitostjo v proizvodnem obratu oziroma z doseganjem zastavljenih terminskih planov. V diplomski nalogi bomo na podlagi lastnega projekta preučili, kako bi lahko dosegli večjo učinkovitost pri doseganju terminskega plana s spremljanjem pretočnega časa izdelka v proizvodnji. Z opazovanjem proizvodnje izdelka smo ugotovili, da je ozko grlo strojna obdelava izdelka, in kot rešitev vidimo predvsem uvedbo terminskega plana za strojno obdelavo oziroma uveljavitev programa Perftech.Largo.
Keywords:načrtovanje proizvodnje, pretočni čas, terminski plan, terminiranje, strojna obdelava
Place of publishing:Maribor
Publisher:[T. Gmeiner]
Year of publishing:2012
PID:20.500.12556/DKUM-36852 New window
UDC:658.523(043.2)
COBISS.SI-ID:17005334 New window
NUK URN:URN:SI:UM:DK:CVKRRMXC
Publication date in DKUM:21.11.2012
Views:2720
Downloads:287
Metadata:XML DC-XML DC-RDF
Categories:KTFMB - FS
:
Copy citation
  
Average score:(0 votes)
Your score:Voting is allowed only for logged in users.
Share:Bookmark and Share



Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.

Secondary language

Language:English
Title:Make-to-order production planning in company Tehcenter Ptuj
Abstract:Production planing represents a connection between construction, production, and consequently montage, because it prescribes, how the product will be made. At Tehcenter Ptuj, most of the problems occur namely with productivity in the production facility, or with achieving the schedule. In my thesis, I will examine possibilities, how to achieve more efficiency with the achieving of schedule, on the basis of monitoring the flow time, during the production. By observing the production of the product, I came to a conclusion, that the bottleneck in our company is caused by the way of machining. As a possible sollution of this problem, I would suggest the introduction of a machining schedule, that is introduction of the Perftech.Largo software.
Keywords:production planing, flow time, schedule, scheduling, machining


Comments

Leave comment

You must log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica