| | SLO | ENG | Cookies and privacy

Bigger font | Smaller font

Show document Help

Title:REKONSTRUKCIJA 110kV STIKALIŠČA RTP SELCE IN PREHOD IZ PROSTOZRAČNEGA V GIS STIKALIŠČE
Authors:ID Cizerle, Silvester (Author)
ID Virtič, Peter (Mentor) More about this mentor... New window
Files:.pdf VS_Cizerle_Silvester_2012.pdf (4,94 MB)
MD5: 7A39043DC2D1C30D34AAF4307BA79F71
PID: 20.500.12556/dkum/93b97b00-cefd-4dd7-a3d1-c9181f93c2ee
 
Language:Slovenian
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FE - Faculty of Energy Technology
Abstract:Zadnja obnova stikališča 110kV v RTP Selce, je bila v letih 1979 do 1987, Naprave so tehnološko že precej zastarele, celotno stikališče pa je bilo zasnovano v petdesetih letih prejšnjega stoletja glede na takratne potrebe. Dandanes pa obratovalno težko izpolnjuje zahteve v elektroenergetskem sistemu Slovenije. V diplomskem delu je predstavljeno sedanje stanje stikališča 110kV RTP Selce, opisane so naprave ki trenutno obratujejo (zbiralke, odklopniki, ločilniki). Opisani so vzroki za prenovo stikališča in cilji rekonstrukcije, opisano je potrebno dimenzioniranje naprav in izbira samih naprav GIS postroja ter predstavitev le-teh.
Keywords:razdelilna transformatorska postaja, elektroenergetski sistem, stikališče, zbiralke, odklopniki, ločilniki, dimenzioniranje naprav, GIS (Gas Insulated Switchgear)
Place of publishing:Krško
Publisher:[S. Cizerle]
Year of publishing:2012
PID:20.500.12556/DKUM-38920 New window
UDC:621.316.574(043.2)
COBISS.SI-ID:1024109148 New window
NUK URN:URN:SI:UM:DK:RZY56RCW
Publication date in DKUM:07.12.2012
Views:4068
Downloads:435
Metadata:XML DC-XML DC-RDF
Categories:FE
:
Copy citation
  
Average score:(0 votes)
Your score:Voting is allowed only for logged in users.
Share:Bookmark and Share



Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.

Secondary language

Language:English
Title:RECONSTRUCTION OF 110 kV SUBSTATION SELCE AND TRANSITION FROM OVERHEAD TO GIS SUBSTATION
Abstract:The last reconstruction of 110 kV substation Selce was carried out in the period from 1979 to 1987. Entire substation was designed in the fifties of last century according to the needs of that time and is today consequently faced with difficulties in meeting operational requirements in the electricity system of Slovenia. The thesis presents the current condition of 110 kV substation Selce, describes currently operating devices (busbars, circuit breakers, disconnectors). It also describes and explains the reasons for and the goals of its planned reconstruction and contains a description of dimensioning of the neccessary devices and selection of GIS unit devices and their introduction.
Keywords:distribution transformer substation, electrical power network, switchgear, busbars, circuit breakers, disconnectors, dimensioning of switchgears, GIS (Gas Insulated Switchgear)


Comments

Leave comment

You must log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica