| | SLO | ENG | Cookies and privacy

Bigger font | Smaller font

Show document Help

Title:Uvedba 5S in SMED metode na montažno linijo za izdelavo izplakovalnikov
Authors:ID Gornik, Domen (Author)
ID Drstvenšek, Igor (Mentor) More about this mentor... New window
ID Leber, Marjan (Comentor)
Files:.pdf VS_Gornik_Domen_2014.pdf (1,98 MB)
MD5: F9D886C46AFACE601F3E97C3B6D5F088
 
Language:Slovenian
Work type:Undergraduate thesis
Typology:2.11 - Undergraduate Thesis
Organization:FS - Faculty of Mechanical Engineering
Abstract:Z uspešnim uvajanjem 5S metode v podjetje oziroma v proizvodnjo, smo dosegli urejenost delovnih mest, tako v pisarnah, kakor tudi v proizvodnji. S tem smo v proizvodnji pripravili pogoje za uvedbo SMED metode, s katero smo dosegli bistveno skrajšanje časa menjav, med posameznimi vrstami izplakovalnikov na montažni liniji za izdelavo izplakovalnikov. Skupni vzorec obeh metod, bomo kasneje prenesli na vse montažne linije, kakor tudi na vse brizgalne stroje za brizganje iz plastičnega granulata, kjer menjave, glede na časovni potek, trajajo dlje časa. Sam čas menjave med posameznimi vrstami izplakovalnikov traja 35 minut, ker smo skrajšali čas menjave na 5 minut, smo s tem povečali storilnost na montažni liniji za 150 izplakovalnikov. Ob uvedbi obeh metod, smo upoštevali vse varnostne zahteve, standarde in predpise delovnih mest, ter ergonomijo dela, za delavce na tej montažni liniji.
Keywords:Montažna linija, vzdrževanje, proizvodnja
Place of publishing:Maribor
Publisher:[D. Gornik]
Year of publishing:2014
PID:20.500.12556/DKUM-43563 New window
UDC:005.59:658.515(043.2)
COBISS.SI-ID:17744406 New window
NUK URN:URN:SI:UM:DK:QSD9GEEC
Publication date in DKUM:18.03.2014
Views:2189
Downloads:288
Metadata:XML DC-XML DC-RDF
Categories:KTFMB - FS
:
Copy citation
  
Average score:(0 votes)
Your score:Voting is allowed only for logged in users.
Share:Bookmark and Share



Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.

Secondary language

Language:English
Title:Introduction of 5S and SMED methods to the toilet cisterns assembly line
Abstract:The introduction of the 5S method into the production of the company increased the order in offices and also in the production areas. The 5S method was used to prepare optimal conditions to establish the SMED method that shortened the time between exchanges of different toilet cisterns types on the assembly line. Both methods will be used on all other assembly lines and also on injection molding machines to spray granulate, as exchanges in those operations are time intensive. The exchange between two different toilet cisterns types took about 35 minutes and was shortened to 5 minutes which caused an increase of production by additional 150 toilet cisterns per one assembly line. All production standards, production regulations, safety regulations and labour ergonomy were considered when incorporating both methods
Keywords:Assembly line, Maintenance, Production


Comments

Leave comment

You must log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica