| | SLO | ENG | Cookies and privacy

Bigger font | Smaller font

Show document Help

Title:PROJEKTIRANJE ŽELEZNIŠKEGA MOSTU ČEZ DRAVO PRI VELIKOVCU
Authors:ID Arnuga, Iztok (Author)
ID Kuhta, Milan (Mentor) More about this mentor... New window
ID Fritsch, Michael (Comentor)
Files:.pdf MAG_Arnuga_Iztok_2014.pdf (8,05 MB)
MD5: 1A38D7C12D691A7F25323C1C01685742
 
Language:Slovenian
Work type:Master's thesis/paper
Typology:2.09 - Master's Thesis
Organization:FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture
Abstract:Magistrsko delo obravnava gradnjo in projektiranje mostu, ki premošča Dravo v bližini Velikovca na avstrijskem Koroškem in je del hitre povezave med Celovcem in Gradcem. Podan je opis gradbenih faz, pri čemer je poudarek na izvedbi zgornje konstrukcije, ki je izvedena z metodo narivanja s pomočjo izvedbe suhih, prednapetih stikov. Nadaljnje so prikazani dimenzioniranje suhega stika, dokaz interakcije tirov z mostno konstrukcijo in dinamična analiza za prečkanje vlaka.
Keywords:prednapeti beton, železniški most, narivanje, suhi stik, interakcija mostu s tiri, dinamična analiza
Place of publishing:Maribor
Publisher:[I. Arnuga]
Year of publishing:2014
PID:20.500.12556/DKUM-43589 New window
UDC:624.21:625.1(043.2)
COBISS.SI-ID:17819158 New window
NUK URN:URN:SI:UM:DK:6BOV3UT9
Publication date in DKUM:06.03.2014
Views:1999
Downloads:358
Metadata:XML DC-XML DC-RDF
Categories:KTFMB - FG
:
Copy citation
  
Average score:(0 votes)
Your score:Voting is allowed only for logged in users.
Share:Bookmark and Share



Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.

Secondary language

Language:English
Title:DESIGN OF THE RAILWAY BRIDGE OVER THE DRAVA RIVER AT VELIKOVEC
Abstract:The subject of this master thesis is the design and construction of the railway bridge over the Drava River at Velikovec, which is going to be a part of the new connection between Klagenfurt and Graz. A detailed description of the construction of the superstructure with the incremental launching method, using prestressed dry joints is given. Also the design of the dry joint, rail-bridge interaction and dynamic analysis of a train passage is presented.
Keywords:prestressed concrete, railway bridge, incremental launching, dry joint, rail-bridge interaction, dynamic analysis


Comments

Leave comment

You must log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica