| | SLO | ENG | Cookies and privacy

Bigger font | Smaller font

Show document Help

Title:ČASOVNA IN STROŠKOVNA ANALIZA GRADNJE OBJEKTOV Z ZIDNIMI SISTEMI WIENERBERGER OB PODPORI BIMA
Authors:ID Lešnik, Andrej (Author)
ID Šuman, Nataša (Mentor) More about this mentor... New window
ID Pučko, Zoran (Comentor)
Files:.pdf VS_Lesnik_Andrej_2016.pdf (3,02 MB)
MD5: 1F3AADDEE763CEDA6A2E9DA61ABAA432
 
Language:Slovenian
Work type:Undergraduate thesis
Typology:2.11 - Undergraduate Thesis
Organization:FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture
Abstract:V diplomskem delu smo predstavili in analizirali zidna sistema proizvajalca Wienerberger Opekarna Ormož d.o.o., in to pri različnih širinah. Obravnavana zidna sistema Porotherm S in Porotherm PROFI imata določeno tehnologijo izvedbe ter vključene elemente. Analizo smo izvedli ob pomoči informacijskega modeliranja stavb (BIM). Izdelali smo dva osnovna 3D-modela nosilnih sten, od katerih ima vsak šest variant modelov nosilnih sten, ki se razlikujejo po debelini zidu, uporabljenem zidnem sistemu in po tem, ali so v zidu odprtine ali ne, ter ju časovno in stroškovno analizirali.
Keywords:zidni sistem, opeka, BIM, stroški gradnje, časovna analiza
Place of publishing:Maribor
Publisher:[A. Lešnik]
Year of publishing:2016
PID:20.500.12556/DKUM-57790 New window
UDC:692.2:[004:624]+657.478(043.2)
COBISS.SI-ID:19806998 New window
NUK URN:URN:SI:UM:DK:AKS4DTQU
Publication date in DKUM:01.04.2016
Views:2329
Downloads:214
Metadata:XML DC-XML DC-RDF
Categories:KTFMB - FG
:
Copy citation
  
Average score:(0 votes)
Your score:Voting is allowed only for logged in users.
Share:Bookmark and Share



Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.

Secondary language

Language:English
Title:TIME AND COST ANALYSIS OF BUILDING CONSTRUCTION WITH WIENERBERGER WALL SYSTEMS BY THE SUPPORT OF BIM
Abstract:The thesis presents and analyses two wall systems of different thicknesses of the manufacturer Wienerberger Opekarna Ormož d.o.o. The discussed wall systems Porotherm S and Porotherm PROFI have a specific implementation technology and integrated elements. We performed the analysis with the help of building information modeling (BIM). We developed two basic 3D models of load-bearing walls, of which each has six variants of models of load-bearing walls, which vary according to the thickness of the wall, the used wall system, and whether there are openings in the wall or not. We then performed a time and cost analysis.
Keywords:wall system, bricks, BIM, construction costs, time analysis


Comments

Leave comment

You must log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica