Title:Rekonstrukcija 10 kV stikališča v podjetju Talum Kidričevo
Authors:ID Pal, Stanislav (Author)
ID Ribič, Janez (Mentor) More about this mentor... New window
Files:.pdf VS_Pal_Stanislav_2016.pdf (4,79 MB)
MD5: 192A650363663237A1275923FB9779FA
 
Language:Slovenian
Work type:Undergraduate thesis
Typology:2.11 - Undergraduate Thesis
Organization:FERI - Faculty of Electrical Engineering and Computer Science
Abstract:V diplomskem delu je predstavljen potek rekonstrukcije 10 kV stikališča v podjetju Talum Kidričevo. Predstavljeno je sedanje stanje stikališča, obstoječi sistem nadzora in zaščite, pomožno napajanje z izmenično in enosmerno napetostjo ter način obratovanja. Za novo stikališče je opravljen kratkostični izračun tripolnega kratkega stika in dimenzioniranje sistema in naprav na podlagi katerega smo izbrali opremo. Stikališče je izvedeno z enojnimi zbiralkami. Transformatorja TR1 in TR3 napajata ločeno dva sektorja, ki ju je možno vzdolžno povezati. Konfiguracija 10 kV mreže omogoča krožno napajanje porabnikov tako, da je možnost izpada zelo mala. S tem smo povečali obratovalno zanesljivost stikališča.
Keywords:rekonstrukcija stikališča, transormatorska postaja, stikalne naprave, zbiralke
Place of publishing:[Maribor
Publisher:S. Pal
Year of publishing:2016
PID:20.500.12556/DKUM-62571 New window
UDC:621.311.42:316.35(043.2)
COBISS.SI-ID:19988758 New window
NUK URN:URN:SI:UM:DK:PC6PJCAQ
Publication date in DKUM:22.09.2016
Views:1739
Downloads:147
Metadata:XML DC-XML DC-RDF
Categories:KTFMB - FERI
:
Copy citation
  
Average score:(0 votes)
Your score:Voting is allowed only for logged in users.
Share:Bookmark and Share



Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.

Secondary language

Language:English
Title:Reconstruction of 10 kV substation in Talum Kidričevo
Abstract:This thesis presents the course of the reconstruction of 10 kV substation in company Talum Kidričevo. Presented the current state of the substation, the existing system of control and protection, auxiliary power supply with AC and DC voltage and operating mode. For the new substation has to calculate the short three-pole short circuit and system design and equipment on the basis of which we selected equipment. The switching is done with single busbars. Transformer TR1 and TR3 be powered from two separate sectors, which can be longitudinally linked. Configuration of 10 kV network enables circular power consumers to the possibility of failure is very small. With this we have increased operational reliability substation.
Keywords:reconstruction of substation, transformers station, switchboard devices, busbar


Comments

Leave comment

You must log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica