| | SLO | ENG | Cookies and privacy

Bigger font | Smaller font

Show document Help

Title:PREUREDITEV PROCESA MONTAŽE OKEN
Authors:ID Mohorič, Marko (Author)
ID Urh, Benjamin (Mentor) More about this mentor... New window
Files:.pdf VS_Mohoric_Marko_2016.pdf (1,42 MB)
MD5: C9C0B72F3672E81811D34BF62617BD7D
 
Language:Slovenian
Work type:Bachelor thesis/paper
Organization:FOV - Faculty of Organizational Sciences in Kranj
Abstract:V diplomskem delu predstavljamo preureditev procesa montaže oken z investicijo v dvigala v podjetju Jelovica okna d.o.o. Glavni problem so dolgi, slabi in nevarni transportni tokovi in težka velika stekla, ki jih je treba prenašati in vstavljati v izdelke, ter prelaganje izdelkov iz montažne linije na palete. V diplomskem delu prikazujemo novo preureditev procesa in investicijo v dvigala za vstavljanje težkih stekel v okna in prelaganje težkih izdelkov. Nova preureditev predvideva obračanje smeri montažne linije v nasprotno stran in preboj ter vgradnjo novih vrat za prehod v skladišče gotovih izdelkov. Ob obračanju smeri linije smo predvideli in vključili novo mostno dvigalo in nov steber s konzolo in manipulatorjema. Predvidena nova preureditev prinaša izredno skrajšanje transportne poti za prevoz gotovih izdelkov iz proizvodnje v skladišče. Krajša in optimalna transportna pot bi nam prinesla prihranek pri času in zmanjšala možnost transportnih poškodb izdelkov in materialov. Z investicijo v novo mostno dvigalo, nov steber s konzolo in manipulatorjema pa bi bistveno izboljšali varnost ljudi pri vstavljanju stekel in prelaganju težkih izdelkov, ter izboljšali ergonomske pogoje za delavce.
Keywords:transportni tok, proizvodni proces montaže, mostno dvigalo, steber z konzolno roko in manipulatorjema, proizvodni postopek
Place of publishing:Kranj
Year of publishing:2016
PID:20.500.12556/DKUM-64117 New window
COBISS.SI-ID:7738387 New window
NUK URN:URN:SI:UM:DK:GOSTLSUR
Publication date in DKUM:06.10.2016
Views:1123
Downloads:108
Metadata:XML DC-XML DC-RDF
Categories:FOV
:
Copy citation
  
Average score:(0 votes)
Your score:Voting is allowed only for logged in users.
Share:Bookmark and Share



Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.

Secondary language

Language:English
Title:REARANGEMENT OF THE WINDOW ASSEMBLY PROCESS
Abstract:The subject of this thesis is a suggestion for a rearrangement of the process of window assembly by investing into overhead cranes in Jelovica Okna Ltd. The main challenges are long, problematic and dangerous transport routes and big and heavy window panes which need to be handled and installed into products, as well as the transfer of products from the assembly line to pallets. In this thesis I suggest a rearrangement of the process and investment into an overhead crane for installing heavy window panes and transferring heavy products. The rearrangement suggests reversing the direction of the assembly line into the opposite direction, demolishing part of the wall and installation of a new door to the finished products warehouse. Besides reversing the direction of the assembly line, a new overhead crane and a new mast, boom and manipulators are also suggested. The suggested rearrangement would make the transport route for finished products to the warehouse considerably shorter. The shorter and optimised transport route would save time and lower the likelihood of transport damage to products and materials. By investing into a new overhead crane, a new mast and boom with two manipulators, we would significantly improve the safety of the workers installing the panes and transferring heavy products as well as improve working conditions.
Keywords:transport route, assembly process, overhead crane, mast with a boom and manipulators, production process.


Comments

Leave comment

You must log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica