| | SLO | ENG | Cookies and privacy

Bigger font | Smaller font

Show document Help

Title:Primerjava izračuna prostornine izkopa gradbene jame po klasični in sodobni metodi ter stroškovna in časovna analiza : diplomsko delo
Authors:ID Županec, Matej (Author)
ID Šuman, Nataša (Mentor) More about this mentor... New window
ID Pučko, Zoran (Comentor)
Files:.pdf VS_Zupanec_Matej_2020.pdf (3,26 MB)
MD5: 3A9EAFE9DB33B6803C2B55F9EC406E4D
PID: 20.500.12556/dkum/1fe297fa-a016-49b3-9a88-46db0fbd274c
 
.zip VS_Zupanec_Matej_2020.zip (15,99 MB)
MD5: 099946F36CDBABC48E54786857213678
PID: 20.500.12556/dkum/a8de29c5-7b77-42a2-9cea-4e6a7e8b33f1
 
Language:Slovenian
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture
Abstract:V diplomskem delu smo za gradnjo objekta Studenški razgledi izdelali primerjavo metod za izračun prostornine izkopa gradbene jame. Najprej smo opisali tehnične značilnosti objekta, ki se gradi, in podali opis gradbene jame. Sledi predstavitev dveh metod in postopka za izračun prostornine izkopa gradbene jame, in sicer po klasični metodi z uporabo nivelmanske mreže in po sodobni metodi. Izkop gradbene jame je bil izveden v štirih korakih, zato smo 3D model gradbene jame razdelili na štiri faze. Nato smo naredili popis del, izračun stroškov ter podali ponudbeno ceno izkopa v okviru stroškovne analize. V okviru časovne analize smo izdelali terminski plan z mrežno tehniko s programom Microsoft Project za obe metodi izračuna prostornine.
Keywords:gradbena jama, nivelmanska mreža, 3D model, stroškovna analiza, časovna analiza
Place of publishing:Maribor
Place of performance:Maribor
Publisher:[M. Županec]
Year of publishing:2020
Number of pages:IX, 50 str., [5] f. zganj. pril. z načrti
PID:20.500.12556/DKUM-77697 New window
UDC:624
COBISS.SI-ID:32761859 New window
NUK URN:URN:SI:UM:DK:ADYLURSC
Publication date in DKUM:06.10.2020
Views:1759
Downloads:271
Metadata:XML DC-XML DC-RDF
Categories:KTFMB - FG
:
Copy citation
  
Average score:(0 votes)
Your score:Voting is allowed only for logged in users.
Share:Bookmark and Share



Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.

Licences

License:CC BY-NC-ND 4.0, Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International
Link:http://creativecommons.org/licenses/by-nc-nd/4.0/
Description:The most restrictive Creative Commons license. This only allows people to download and share the work for no commercial gain and for no other purposes.
Licensing start date:10.09.2020

Secondary language

Language:English
Title:Comparison of calculation of the construction pit excavation volume by classical and modern method and the cost and time analysis
Abstract:The diploma thesis deals with comparison of methods for calculating the construction pit excavation volume in the construction of the Studeniški razgledi facility. Initially, the technical characteristics of the building under construction and the construction pit are described. That is followed by presentation of two methods and the process of calculating the construction pit excavation volume, namely by the classical leveling network method and by the modern method. The excavation of the construction pit is carried out in four steps, so the 3D model of the construction pit is divided into four phases. As part of the cost analysis, the works are listed, the costs are calculated and the bids for the excavation are submitted. Within the time analysis, a term schedule was created in Microsoft Project by the technique of network design for both methods of volume calculation.
Keywords:construction pit, leveling network, 3D model, cost analysis, time analysis


Comments

Leave comment

You must log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica