| | SLO | ENG | Cookies and privacy

Bigger font | Smaller font

Show document Help

Title:Sprememba pogodbene cene v fazi gradnje objekta : diplomsko delo
Authors:ID Tominc, Stanko (Author)
ID Šuman, Nataša (Mentor) More about this mentor... New window
Files:.pdf VS_Tominc_Stanko_2022.pdf (5,06 MB)
MD5: 819B2D23AE3A94D62A5CFD8B8DFB9355
PID: 20.500.12556/dkum/f3b1cc81-b59c-40a5-a5a8-a5b8766bc764
 
Language:Slovenian
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture
Abstract:V diplomskem smo opisali proces priprave ponudbe in ponudbenega predračuna na področju javnega naročanja ter razloge, ki vplivajo na spremembo pogodbene cene v času gradnje objekta. Pravna in gradbena praksa sta za različne primere izoblikovali načine reševanja sprememb na pogodbah, ki smo jih v diplomskem delu tudi predstavili. Med številnimi izzivi je trenutno zagotovo najbolj aktualen poiskati uravnoteženo rešitev za spremembo pogodbene cene zaradi nepredvidene rasti cen na trgu. V diplomskem delu smo v ta namen opisali različne metode izračuna razlik v ceni storitev pri gradnji objektov ter predstavili njihove prednosti in slabosti. Dve opisani metodi sta uporabljeni na praktičnem primeru javnega naročila za izgradnjo kanalizacije. Izračun valorizacije je izveden z računsko metodo izračuna indeksa razlik v ceni, ki temelji na dejanskih stroških, in s pomočjo metode določanja razlike v ceni z indeksi GZS ZGIGM. Rezultate izračuna po obeh metodah smo primerjali ter jih v diskusiji natančneje povzeli in komentirali.
Keywords:gradbena pogodba, javno naročanje, ponudbeni predračun, sprememba pogodbene cene, indeks razlik v ceni
Place of publishing:Maribor
Place of performance:Maribor
Publisher:[S. Tominc]
Year of publishing:2022
Number of pages:1 spletni vir (1 datoteka PDF (IX, 85 f.))
PID:20.500.12556/DKUM-81892 New window
UDC:657.442:69.05(043.2)
COBISS.SI-ID:120707331 New window
Publication date in DKUM:23.06.2022
Views:1337
Downloads:264
Metadata:XML DC-XML DC-RDF
Categories:KTFMB - FG
:
Copy citation
  
Average score:(0 votes)
Your score:Voting is allowed only for logged in users.
Share:Bookmark and Share



Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.

Licences

License:CC BY-NC-ND 4.0, Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International
Link:http://creativecommons.org/licenses/by-nc-nd/4.0/
Description:The most restrictive Creative Commons license. This only allows people to download and share the work for no commercial gain and for no other purposes.
Licensing start date:14.06.2022

Secondary language

Language:English
Title:Amendments to the contract price during the construction phase
Abstract:In the diploma thesis we described the process of preparation of offers and bid quotations in the field of public procurement, as well as the factors that lead to amendments to the contract price during the construction of a building. The diploma thesis also presents the methods of dealing with amendments to contracts, that were developed within legal and construction practices for different cases. Among the many challenges that the sector faces, currently the most significant one is finding a balanced solution for the amendment of contract prices in relation to unforeseen price increases on the market. To this end, the diploma thesis examines different methods for calculating price differences of services pertaining to the construction of buildings and presents their strengths and weaknesses. Two of the described methods were applied to a practical example of a public contract for the construction of a sewage system. The valuation calculation was performed by using a calculation method involving the calculation of the price difference index, which is based on actual costs incurred, and the method for determining the price difference by applying the indexes of the Chamber of Construction and Building Material Industry of the Chamber of Commerce and Industry of Slovenia. We compared the results of the calculations obtained through both methods and provided a more detailed summary and comment in the discussion.
Keywords:construction contract, public procurement, bid quotation, amendment to the contract price, price difference index


Comments

Leave comment

You must log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica