| | SLO | ENG | Cookies and privacy

Bigger font | Smaller font

Show document Help

Title:Preureditev obstoječih dveh transformatorskih postaj in menjava 20 kV daljnovoda z nadomestnim kablovodom : diplomsko delo
Authors:ID Kavalar, Jure (Author)
ID Beković, Miloš (Mentor) More about this mentor... New window
Files:.pdf VS_Kavalar_Jure_2025.pdf (3,85 MB)
MD5: D13B1954F852CFE914EDDB86C26C1835
 
Language:Slovenian
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FERI - Faculty of Electrical Engineering and Computer Science
Abstract:Zanesljivost in učinkovitost obratovanja elektrodistribucijskega sistema sta ključna dejavnika za zanesljivo oskrbo porabnikov z električno energijo. Zaradi vseh večjih obremenitev, večje občutljivosti porabnikov ter zahtev po zmanjšanju izgub je nujno stalno posodabljanje in optimiziranje distribucijskega omrežja. Eden izmed pomembnih ukrepov je zamenjava obstoječih nadzemnih daljnovodov s podzemnimi kablovodi, saj ti prinašajo številne prednosti. Takšna modernizacija omrežja pomembno prispeva k povečanju varnosti, zmanjšanju stroškov vzdrževanja in zagotavljanju učinkovitejše distribucije električne energije. V nalogi so predstavljeni vsi poteki izvedbe projekta prenove in nadgradnje elektro distribucijske povezave z realnimi postopki od samega začetka in do konca.
Keywords:daljnovod, projektiranje, varnost, zanesljivost, distribucija
Place of publishing:Maribor
Place of performance:Maribor
Publisher:[J. Kavalar]
Year of publishing:2025
Number of pages:1 spletni vir (1 datoteka PDF (V, 57 str.))
PID:20.500.12556/DKUM-94454 New window
UDC:621.315(043.2)
COBISS.SI-ID:256365315 New window
Publication date in DKUM:22.10.2025
Views:135
Downloads:27
Metadata:XML DC-XML DC-RDF
Categories:KTFMB - FERI
:
Copy citation
  
Average score:(0 votes)
Your score:Voting is allowed only for logged in users.
Share:Bookmark and Share



Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.

Licences

License:CC BY-NC-ND 4.0, Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International
Link:http://creativecommons.org/licenses/by-nc-nd/4.0/
Description:The most restrictive Creative Commons license. This only allows people to download and share the work for no commercial gain and for no other purposes.
Licensing start date:18.08.2025

Secondary language

Language:English
Title:Reconstruction of two existing transformer stations and replacement of 20 kV overhead powerline with underground cable
Abstract:The reliability and efficiency of electricity distribution system operation are key factors for ensuring a secure supply of electrical energy to consumers. Due to increasing loads, higher sensitivity of consumers, and the demand for loss reduction, continuous upgrading and optimization of the distribution network are essential. One of the important measures is the replacement of existing overhead lines with underground cables, as these provide numerous advantages. Such modernization of the network significantly contributes to improved safety, reduced maintenance costs, and more efficient electricity distribution. This thesis presents the complete process of implementing the renovation and upgrade project of the electricity distribution connection, with real procedures from the very beginning through to completion.
Keywords:overhead line, planning, safety, reliability, distribution


Comments

Leave comment

You must log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica