| | SLO | ENG | Cookies and privacy

Bigger font | Smaller font

Show document Help

Title:Izvedba analize rentabilnosti proizvodnega sistema komponent izdelka tč r290 v podjetju gorenje d.o.o. : magistrsko delo
Authors:ID Volk, Žiga (Author)
ID Ojsteršek, Robert (Mentor) More about this mentor... New window
ID Frešer, Blaž (Mentor) More about this mentor... New window
Files:.pdf Volk_Ziga.pdf (1,95 MB, This file will be accessible after 18.11.2028)
MD5: 94FE4BEA8E7D03ED1E6F8C470803CDB1
 
Language:Slovenian
Work type:Master's thesis/paper
Typology:2.09 - Master's Thesis
Organization:FS - Faculty of Mechanical Engineering
Abstract:V nalogi bomo izvedli analizo rentabilnosti selitve sistema TČ R290 iz proizvodne lokacije na kitajskem na lokacijo proizvodnje v Velenju. Nalogo bomo delili na dva dela: primerjavo stroška sistema TČ, če ga izdela dobavitelj na Kitajskem in ga prevažamo v Velenje in simulacijo linije ter preverjanje kapacitet tovarne v Velenju. V prvem delu si bomo ogledali sistem TČ R290 z vidika stroškov. Za ta namen bomo iz kosovnice sistema TČ R290 pridobili ceno vsake komponente in glede na stroške carine, transporta ter ostalih stroškov pridobili realno ceno komponent, če bi jih dobavljali v Velenje. V naslednjem koraku bomo materialnim stroškom prišteli še režijske in na ta način dobili celotno sliko stroškov sistema TČ R290 izdelanega v Velenju. V drugem delu pa se bomo osredotočali na vidik kapacitet in osnovanja proizvodne linije v proizvodnji podjetja Gorenje. V tem delu bomo s programskim paketom Plant simulation simulirali proizvodnjo v podjetju Gorenju in glede na ugotovitve preverili, če kapacitete proizvodnje v podjetju Gorenje omogočajo selitev linije. V tem delu bomo s pomočjo oddelka tehnologije podjetja Gorenje definirali standardne čase za vsako operacijo sestave sistema. Posamezne operacije bomo nato združili v delovna mesta, nato pa simulirali celoten sistem v aplikaciji. Na koncu bomo preverili vse vplivne dejavnike in tveganja pri premiku proizvodne lokacije v podjejte Gorenje. Smiselnost selitve bomo preverili iz vidika tveganj, prilagodljivosti na spremembe, cene in kapacitet proizvodnje v Velenju. Za vsako situacijo bomo poskušali podati argumente za in proti selitvi ter na koncu glede na rezultate analize podali mnenje o smiselnosti selitve sistema TČ R290.
Keywords:toplotna črpalka R290, analiza stroškov, narediti/kupiti, proizvodne kapacitete, selitev proizvodnje
Place of publishing:Maribor
Place of performance:Maribor
Publisher:[Ž. Volk]
Year of publishing:2025
Number of pages:1 spletni vir (1 datoteka PDF (XII, 55 f., [1] f. pril.))
PID:20.500.12556/DKUM-95649 New window
UDC:658.511(043.2)
COBISS.SI-ID:268439555 New window
Publication date in DKUM:28.01.2026
Views:176
Downloads:0
Metadata:XML DC-XML DC-RDF
Categories:KTFMB - FS
:
Copy citation
  
Average score:(0 votes)
Your score:Voting is allowed only for logged in users.
Share:Bookmark and Share



Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.

Licences

License:CC BY 4.0, Creative Commons Attribution 4.0 International
Link:http://creativecommons.org/licenses/by/4.0/
Description:This is the standard Creative Commons license that gives others maximum freedom to do what they want with the work as long as they credit the author.
Licensing start date:05.10.2025

Secondary language

Language:English
Title:Profitability analysis of the production system for tč r290 components at gorenje d.o.o.
Abstract:In this thesis, we will carry out a profitability analysis of relocating the R290 heat pump system from the production site in China to the Gorenje production in Velenje. The thesis will be divided into two parts: a cost comparison of the R290 HP system when manufactured by a supplier in China and transported to Velenje, and a simulation of the production line with a capacity assessment of the Gorenje production in Velenje. In the first part, we will examine the R290 HP system from a cost perspective. For this purpose, we will derive the price of each component from the bill of materials of the R290 HP system and, by including customs duties, transport costs, and other expenses, we will obtain the actual cost of components if supplied to Velenje. In the next step, we will add overhead costs to the material costs in order to obtain the complete cost picture of the R290 HP system manufactured in Velenje. In the second part, we will focus on production capacity and the establishment of a production line at the company Gorenje. Using the Plant Simulation software package, we will simulate production in Velenje and, based on the results, verify whether the company’s capacity enables the relocation of the line. With the support of Gorenje’s technology department, we will define the standard times for each assembly operation of the system. These operations will then be grouped into workstations, after which the entire system will be simulated within the application. Finally, we will evaluate all influencing factors and risks associated with relocating the production site to the Velenje production. The feasibility of relocation will be assessed from the perspective of risks, adaptability to changes, production costs, and company’s capacity in Velenje. For each scenario, we will provide arguments for and against relocation, and ultimately, based on the results of the analysis, we will present a conclusion regarding the feasibility of relocating the R290 HP system.
Keywords:Heat pump R290, cost analysis, make-or-buy decision, production capacity, production relocation


Comments

Leave comment

You must log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica