| | SLO | ENG | Cookies and privacy

Bigger font | Smaller font

Show document Help

Title:Izvedba rekonstrukcije RTP Brežice z izbiro optimalne variante izvedbe del : diplomsko delo
Authors:ID Verhovšek, Luka (Author)
ID Virtič, Peter (Mentor) More about this mentor... New window
ID Zagoričnik, Aleš (Comentor)
Files:.pdf VS_Verhovsek_Luka_2026.pdf (3,20 MB)
MD5: 6D0EB36E68EFC96AF8E1B935B49E7705
 
Language:Slovenian
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FE - Faculty of Energy Technology
Abstract:V diplomskem delu smo obravnavali razdelilno transformatorsko postajo Brežice (RTP) (110/20 kV), ki je ključno vozlišče elektroenergetskega sistema v Krški kotlini. Zaradi zastarele opreme in nezanesljivega delovanja se je podjetje ELES odločilo za celovito prenovo primarne ter sekundarne opreme. Analizirano bo trenutno stanje obratovanja in izzivi, povezani z dotrajanostjo naprav. Predstavljen bo postopek izbire naprav in načrt izvedbe prenove, s poudarkom na izboljšanju zanesljivosti, fleksibilnosti ter učinkovitosti delovanja po rekonstrukciji. Cilj dela je tudi primerjava stanja pred in po prenovi ter identifikacija ključnih dejavnikov uspeha.
Keywords:elektroenergetski sistem, primarna/sekundarna oprema, rekonstrukcija, RTP Brežice.
Place of publishing:Maribor
Place of performance:Velenje
Publisher:[L. Verhovšek]
Year of publishing:2026
Number of pages:XIII, 40 str.
PID:20.500.12556/DKUM-96094 New window
UDC:621.314.2:621.3.07(043.2)
COBISS.SI-ID:271724035 New window
Publication date in DKUM:16.03.2026
Views:258
Downloads:37
Metadata:XML DC-XML DC-RDF
Categories:FE
:
Copy citation
  
Average score:(0 votes)
Your score:Voting is allowed only for logged in users.
Share:Bookmark and Share



Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.

Licences

License:CC BY-NC-ND 4.0, Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International
Link:http://creativecommons.org/licenses/by-nc-nd/4.0/
Description:The most restrictive Creative Commons license. This only allows people to download and share the work for no commercial gain and for no other purposes.
Licensing start date:01.12.2025

Secondary language

Language:English
Title:Implementation of the reconstruction of the Brežice substation with the selection of the optimal variant for the implementation of works
Abstract:In this thesis, we examined the Brežice distribution transformer station (RTP) (110/20 kV), which serves as a key node in the power system of the Krško Basin. Due to outdated equipment and unreliable operation, the company ELES decided to carry out a comprehensive renovation of both primary and secondary equipment. The current operational state and challenges related to equipment wear and aging will be analyzed. The selection process for new equipment and the renovation implementation plan will be presented, with an emphasis on improving reliability, flexibility, and operational efficiency after the reconstruction. The objective of the thesis is also to compare the state before and after the renovation and to identify the key success factors.
Keywords:Brežice substation, power system, primary/secondary equipment, reconstruction.


Comments

Leave comment

You must log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica