| | SLO | ENG | Cookies and privacy

Bigger font | Smaller font

Show document Help

Title:Izboljšava procesa fizičnega pregleda v carinskem skladišču : diplomsko delo
Authors:ID Slevec, Janez (Author)
ID Lerher, Tone (Mentor) More about this mentor... New window
ID Marolt, Jakob (Comentor)
Files:.pdf VS_Slevec_Janez_2026.pdf (2,03 MB, This file will be accessible after 23.06.2029)
MD5: 222467D3D2C24DAE4316C8E0DD3D028F
 
Language:Slovenian
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FL - Faculty of Logistic
Abstract:Diplomsko delo obravnava časovno učinkovitost fizičnih pregledov v carinskem skladišču ter predlaga organizacijsko-tehnološke izboljšave procesa. V praksi se fizični pregledi pogosto izvajajo na razpršenih lokacijah znotraj skladišča, kar povzroča dodatne premike, čakanja in prekinitve rednega dela skladiščnikov. Posledično se podaljšujejo procesni časi in povečuje obremenitev ekip. V okviru desetdnevnega opazovanja smo izvedli 15 fizičnih pregledov v dveh skladiščnih območjih: v »Fazi I« (regalni del) in v območju »cross-dock«. Ugotovljeni povprečni časi na pošiljko znašajo 23,1 minute v »Fazi I« ter 14,3 minute v območju »cross-dock«, skupni cikel obstoječega procesa pa v povprečju znaša 37,4 minute. Analiza je temeljila na časovni študiji in procesni karti, s katerima smo prepoznali ključna ozka grla. Ta izvirajo iz razpršenosti con, odsotnosti centralne pregledne točke z ustrezno opremo, dodatnih premikov osebja in opreme ter neenakomerne obremenitve ekip. Kot rešitev predlagamo vzpostavitev namenskega prostora za fizične preglede, kjer se pošiljke predhodno pripravijo in kjer je potrebna oprema zbrana na enem mestu, ob podpori informacijskega sistema WMS. Modelni izračuni kažejo, da bi se s predlaganim pristopom čas na pošiljko skrajšal na 7,3 minute v »Fazi I« in 6,0 minute v območju »cross-dock«, celotni cikel pa na približno 13,3 minute. Omejitve raziskave predstavljajo kratek opazovalni interval, obravnava enega skladišča ter predpostavke uporabljenega modela.
Keywords:fizični pregled blaga, carinsko skladišče, centralizacija pregledov (namenski prostor)
Place of publishing:Celje
Place of performance:Celje
Publisher:J. Slevec
Year of publishing:2026
Number of pages:1 spletni vir (1 datoteka PDF (XV, 46 str.))
PID:20.500.12556/DKUM-98236 New window
UDC:658.78:339.543:005.591(043.2)
COBISS.SI-ID:287414531 New window
Publication date in DKUM:10.08.2026
Views:230
Downloads:0
Metadata:XML DC-XML DC-RDF
Categories:FL
:
Copy citation
  
Average score:(0 votes)
Your score:Voting is allowed only for logged in users.
Share:Bookmark and Share



Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.

Licences

License:CC BY-NC-ND 4.0, Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International
Link:http://creativecommons.org/licenses/by-nc-nd/4.0/
Description:The most restrictive Creative Commons license. This only allows people to download and share the work for no commercial gain and for no other purposes.
Licensing start date:28.05.2026

Secondary language

Language:English
Title:Improvement of the physical inspection process in the customs warehouse
Abstract:The thesis examines the time efficiency of physical inspections in a customs warehouse and proposes organizational and technological improvements. In practice, inspections are often performed at dispersed locations within the warehouse, which leads to additional movements, waiting times, and interruptions to warehouse operations. Over a ten-day observation period, 15 inspections were conducted in two areas: »Phase I« (racking area) and the »cross-dock« area. The average time per shipment was 23.1 minutes in »Phase I« and 14.3 minutes in the »cross-dock« area, while the overall cycle time averaged 37.4 minutes. Using a time study and a process chart, key bottlenecks were identified, including dispersed zones, the lack of a centralized inspection point with appropriate equipment, additional movements of personnel and equipment, and uneven team workload. The proposed solution is a dedicated inspection area where shipments are prepared in advance and all required equipment is available in one place, supported by the WMS information system. Model calculations suggest the time per shipment could be reduced to 7.3 minutes in »Phase I« and 6.0 minutes in the »cross-dock« area, lowering the overall cycle time to approximately 13.3 minutes. Limitations include the short observation period, the analysis of a single warehouse, and model assumptions.
Keywords:physical inspection of goods, customs warehouse, centralised inspection area


Comments

Leave comment

You must log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica