| | SLO | ENG | Cookies and privacy

Bigger font | Smaller font

Show document Help

Title:Development and improvement of a production company (and their product) based on the value stream mapping of business processes
Authors:ID Klimecka-Tatar, Dorota (Author)
ID Obrecht, Matevž (Author)
Files:.pdf Development_and_improvement_Klimecka-Tatar_2024.pdf (541,17 KB)
MD5: 2EF2A0F0DB743C0D7BF6EBF7788029F1
 
URL https://sciendo.com/article/10.2478/mspe-2024-0018
 
Language:English
Work type:Scientific work
Typology:1.01 - Original Scientific Article
Organization:FL - Faculty of Logistic
Abstract:Value stream mapping is one of the basic tools used in the processes improvement or design – in accordance with the Lean concept. This paper presents a model of designing production processes and introducing new products to the market based on the analysis of the value streams flow in the production process. Particular attention was paid to the importance of input data necessary to plan a properly functioning production process, which results in a high-value product (from the customer’s point of view). In the paper also the list of all the most important tools supporting all stages of designing new production processes or improving existing processes has been presented. Also the advantages of big pictures analysis using was highlighted. In this case value stream mapping and big picture analysis were oriented on quality in the product development process and contribute to: creating value (based on customer requirements) while maintaining timely deliveries and constant costs (Value Stream Mapping), sustainable use of tangible and intangible resources (removing waste at the design stage). However, from the company point of view, and particular in the cost level, the product can gain value because a lower input is required for its production. After improvement, the process lead time has been shortened in an area where value was not added, but the consequence of implementing the change is an increase in the production volume while maintaining the process transition time – therefore, unit costs of production will change.
Keywords:lean management, value stream mapping, production, lean manufacturing
Publication status:Published
Publication version:Version of Record
Submitted for review:01.11.2023
Article acceptance date:01.04.2024
Publication date:23.06.2024
Publisher:P. A. Nova
Year of publishing:2024
Number of pages:Str. 185-191
Numbering:Letn. 32, št. 2
PID:20.500.12556/DKUM-93760 New window
UDC:658.5
ISSN on article:2450-5781
COBISS.SI-ID:202615811 New window
DOI:10.2478/mspe-2024-0018 New window
Publication date in DKUM:18.07.2025
Views:141
Downloads:175
Metadata:XML DC-XML DC-RDF
Categories:Misc.
:
Copy citation
  
Average score:(0 votes)
Your score:Voting is allowed only for logged in users.
Share:Bookmark and Share



Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.

Record is a part of a journal

Title:Management systems in production engineering
Shortened title:Manag. syst. prod. eng.
Publisher:P. A. Nova
ISSN:2450-5781
COBISS.SI-ID:70064387 New window

Licences

License:CC BY 4.0, Creative Commons Attribution 4.0 International
Link:http://creativecommons.org/licenses/by/4.0/
Description:This is the standard Creative Commons license that gives others maximum freedom to do what they want with the work as long as they credit the author.

Secondary language

Language:Slovenian
Keywords:vitko upravljanje, zemljevid tokov vrednosti, proizvodnja, vitka proizvodnja


Comments

Leave comment

You must log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica